Materials: BABORD; 1x2 boards; table saw; chisels; wood glue
So.....I got some 1 x 2 boards, traced the cut out of the legs/support that came with it onto my new boards. used the table saw to remove the excess, and some chisels to smooth out the cut-outs. Then had to make two new pairs of legs for the two top levels.
On the two top shelves I needed to remove a little bit of the original material so they would be staggered enough to fit under the stairs. Table for that.
Then glued everything together, used some brad nails for support (pre-drilled, of course, the Ikea pine is notorious for splitting). Put a cross piece in the back for support, and that was that.
~ ken h, canada
Post A Comment:
0 comments:
Post a Comment