Materials: Lack 43" and 74" Shelves
1) confirmed stud location on the wall (and distance between)
2) measured and marked future holes on the rails which I then drilled.
3) Attached rails to studs.
For most cases I was able to hit 3 studs on both lengths of shelves. I'm really satisfied with the results though I might have to add the occasional L-Bracket for some of the shorter shelves that want to dip downwards somewhat. I'm still picking paintings and statuary for the open spaces in the design.
~ Amy S, Portland, OR USA
Post A Comment:
0 comments:
Post a Comment